Skip to content

How it works

A hybrid system for power

Think of a hybrid car: quiet on battery power. The engine only starts when needed.

01

The battery supplies power

Everything you connect runs on the battery. Quietly, with no emissions at the point of use.

02

The generator recharges

When the battery runs low, the generator starts, recharges it and switches itself off.

03

Solar charging during the day

The rooftop solar panels recharge the battery during the day at no fuel cost.

7 out of 24 hours

is how long the generator runs on an average construction day. Runs only on HVO100, biodiesel made from residual and waste fats. Most generators run on ordinary diesel.

View it from every angle

Rotate, zoom and open the hatches. Click on a component for details.

Three modes

Hybrid

Standard

The battery supplies power. The generator only starts when needed.

Always full

Full reserve or backup power

The generator keeps the battery full, so the full reserve is always available.

Emission-free

Generator off

Battery and solar only. Charge the battery at your premises beforehand.

Monitoring

A smart EMS keeps watch

Behind every Skidvolt sits an energy management system (EMS). Via 4G you see live how it runs: consumption, battery level, running hours and alerts, per unit and per project.

View the portal at fleet.skidvolt.nl

Linking units

Linked units work as one system. At normal demand, one generator recharges all batteries while the others stay off. A second only starts when demand rises.

If one generator fails, another takes over.

Four linked Skidvolt units

Why we built it this way

Since 1 July 2026, small consumers also join the waiting list for a grid connection.

Source: KHN

Our choice: Power without a grid connection.

Small consumers wait an average of 45 weeks for a new connection.

Source: NOS, figures from Netbeheer Nederland

Our choice: Power on day one.

A temporary 3 x 80 A site connection is too small for several electric machines. Batteries cover peak demand.

Source: ElaadNL Outlook Bouw 2024

Our choice: Covering peak demand.

From 2028, equipment below 56 kW must be emission-free in tenders issued by the agreement partners.

Source: Berenschot, SEB agreement evaluation

Our choice: Emission-free mode and usage report.

A generator running at low load for long periods develops wet stacking.

Source: Consulting-Specifying Engineer

Our choice: The hybrid principle.

Approx. 40% less fuel and 92% less CO2 than a generator running day and night.

Source: Skidvolt worked example: 220 operating days, approx. 100 kWh per day. CO2 factors co2emissiefactoren.nl 2026: diesel 3.251 and HVO100 0.468 kg per litre.

Our choice: Supports the approach.

LFP cells enter thermal runaway later and release much less gas than NMC cells.

Source: Shen et al., Electronics 2023

Our choice: LiFePO4 batteries.

The battery and inverter are from Deye. One brand, with components designed to work together.

Source: Deye

Our choice: One brand, readily available parts.

SKID-32 and SKID-64

SKID-32

Battery
32 kWh LiFePO4 from Deye
Inverter
20 kW three-phase, from Deye
Battery and inverter brand
One brand, readily available parts
Connections
CEE 400 V and 230 V, with bypass
Generator
Sound-insulated industrial generator, runs only on HVO100, automatic start and stop
Solar panels
3 as standard
Body
3000 x 1800 mm, approx. 2.5 m high
Trailer
Tandem-axle trailer up to 2,000 kg, BE driving licence
Weight
Tandem-axle trailer up to 2,000 kg, BE driving licence
Runtime
To follow
Monitoring
4G, via the EMS portal

SKID-64

Battery
64 kWh LiFePO4 from Deye (2 x 32 kWh removable, approx. 58 kWh usable)
Inverter
20 kW three-phase, from Deye
Battery and inverter brand
One brand, readily available parts
Connections
CEE 400 V and 230 V, with bypass
Generator
Sound-insulated industrial generator, runs only on HVO100, automatic start and stop
Solar panels
3 as standard
Body
3000 x 1800 mm, approx. 2.5 m high
Trailer
Tandem-axle trailer up to 2,000 kg, BE driving licence
Weight
Tandem-axle trailer up to 2,000 kg, BE driving licence
Runtime
approx. 7 days at 50 kWh per day
Monitoring
4G, via the EMS portal

Values are indicative. Drawings and the full technical description are available on request.

Skidvolt technical components on a construction site

Transport

You transport it, or we do

With one 32 kWh battery pack, you can transport it without an ADR certificate. With both packs, that certificate is required. Until your drivers have it, for up to three months, we handle transport at no extra cost. A BE driving licence is still required.

Let us see whether it fits your work.