
Applications / Rail
Quiet night work, emission-free when required
Battery power throughout the rail possession. In emission-free mode, the generator stays off.
Does this sound familiar?
- Working during overnight rail possessions.
- Far from a grid connection.
- Noise and emission limits.
A day on site
Night work runs on the battery. The generator helps only during peaks. Runs only on HVO100, biodiesel made from residual and waste fats. Most generators run on ordinary diesel.
- 00:00 to 02:00Battery supplies power
- 02:00 to 03:00Generator supports supply
- 03:00 to 24:00Battery supplies power
- 08:00 to 17:00Solar charges the battery
- 23:00 to 05:00: lighting and tools run on the battery.
- The generator helps only during peaks.
- Working in a zone that requires zero emissions? Charge the battery beforehand and select emission-free mode.
Savings
Set for a typical job: 120 days per year, approx. 40 kWh per day. Adjust it for your work.
- Current rental, fuel and refuelling
- € 27,624
- Your annual savings with a Skidvolt
- € 6,940
- Generator running hours you save
- 2,544
Assumption: generator rental € 140 per day (market price). We compare equal rental rates. For an owned generator we use the buying benchmark of approx. € 6,800 less per year, including depreciation and maintenance.
Our worked example for you
- Current rental, fuel and refuelling
- € 27,624
- Your annual savings with a Skidvolt
- € 6,940
- Generator running hours you save
- 2,544
It works even when parked
Between projects, you keep it at your premises. It stores solar power or low-cost electricity, covers peaks and provides backup power. Peak shaving, low-cost charging and solar storage at your premises can yield roughly € 1,500 to € 3,000 per year. Sometimes you avoid a grid connection upgrade. Tender points and quiet operation come on top: at approx. 100 kWh per day, the generator is off for 17 hours.
SKID-32 or SKID-64?
Our advice: SKID-64
In emission-free mode, you have only the battery. You need the capacity of 64 kWh, with about 58 kWh usable.
View both modelsWorking for a rail infrastructure manager or rail contractor? Ask us about the requirements for your project.
