Applications / Grid congestion at your premises

Keep growing while you wait for your Dutch grid operator

Up to 20 kW extra per unit alongside your existing connection.

Does this sound familiar?

  • Since 1 July 2026, Dutch grid operators also place small consumers on waiting lists for a grid connection.
  • Small consumers in the Netherlands wait an average of 45 weeks for a new connection.
  • You want to expand, but your connection holds you back.

A day on site

Up to 20 kW extra per unit alongside your existing connection. It covers peaks and provides backup power if the grid fails. Runs only on HVO100, biodiesel made from residual and waste fats. Most generators run on ordinary diesel.

  1. 00:00 to 24:00Battery supplies power
  2. 08:00 to 17:00Solar charges the battery
Our worked example, for guidance. Actual operation depends on usage, weather and season.
  • During the day, it covers peaks that your connection cannot handle.
  • It charges with your own solar power or low-cost electricity.
  • If the grid fails, it provides backup power.

An installer connects it to your business electrical installation. Grid trading is in preparation.

Savings

With grid congestion, everything depends on your connection and peak demand. We can calculate this with you.

Let us assess your connection with you

It works even when parked

Between projects, you keep it at your premises. It stores solar power or low-cost electricity, covers peaks and provides backup power. Peak shaving, low-cost charging and solar storage at your premises can yield roughly € 1,500 to € 3,000 per year. Sometimes you avoid a grid connection upgrade. Tender points and quiet operation come on top: at approx. 100 kWh per day, the generator is off for 17 hours.

SKID-32 or SKID-64?

Our advice: SKID-32 or SKID-64

That depends on your peaks and how long they last. We can work through the calculation with you.